This project was split into two tower blocks and is consisting of 176 residential units. The scope on this project for H1 Interiors Limited was Drylining works and Screeding works. The screeding was laid with a sand cement screed finish and the Drylining was completed through a Steel Formed Sections specification. This was designed specific to the projects performance requirements and is fully compliant and backed by the necessary test data.